详细信息
文献类型:会议论文
英文题名:ANALYSIS OF THE INFLUENCING FACTORS ON ASSEMBLY LINE BALANCING
作者:Hou, Dongliang[1];Liu, Jinhao;Hu, Wanyi;Zhang, Shiliang[1]
机构:[1]Guangdong Ocean Univ, Sch Engn, Zhanjiang, Guangdong, Peoples R China
会议论文集:38th International Conference on Computers and Industrial Engineering
会议日期:OCT 31-NOV 02, 2008
会议地点:Beihang Univ, Beijing, PEOPLES R CHINA
主办单位:Beihang Univ
语种:英文
外文关键词:Assembly line; Balance; Statistical fluctuation; influencing factor
外文摘要:The production capacity declined as a result of some influential factors in the assembly line balance. This paper analyses the locality of the bottleneck workstation, statistical fluctuation of the operational time of the machine and overlap of the employee's professional skills. The result shows: The phenomena about delay and block will be brought in front or back workstation of bottleneck workstation as a result of the different locality of it in assembly line, which makes the loss of assembly line high. The accumulation effect will appear due to the statistical fluctuation of the operational time and be more and more obvious with the more products. The overlap of the employee's professional skill affects the restriction degree between assembly line balancing and distribution of works. According to the affection of learning curve, the balance will be not existed. At last, the paper gives some suggestions to solve this accumulation affection.
参考文献:
正在载入数据...