详细信息
冰蓄冷中央空调预热泵流量模糊控制 ( EI收录) 被引量:4
Fuzzy control of pre-heat pump flow in ice-storage centralized air-conditioning
文献类型:期刊文献
中文题名:冰蓄冷中央空调预热泵流量模糊控制
英文题名:Fuzzy control of pre-heat pump flow in ice-storage centralized air-conditioning
作者:徐今强[1,2,3];冯自平[1];肖睿[1];黄冲[1]
机构:[1]中国科学院广州能源研究所,广东广州510640;[2]中国科学院研究生院,北京100049;[3]广东海洋大学海洋遥感与信息技术实验室,广东湛江524088
年份:2010
卷号:28
期号:3
起止页码:260
中文期刊名:排灌机械工程学报
外文期刊名:Journal of Drainage and Irrigation Machinery Engineering
收录:CSTPCD、、EI(收录号:20102713062842)、Scopus(收录号:2-s2.0-77954271309)
基金:国家自然科学基金委-广东省联合基金资助项目(U0634005);国家863计划项目(2006AA05Z254)
语种:中文
中文关键词:冰蓄冷空调;流量;温度;模糊控制;可编程逻辑控制器
外文关键词:ice-storage air-conditioning; flow rate; temperature; fuzzy control; programmable logic controller
中文摘要:为了解决冰蓄冷中央空调存在的板换堵塞问题,提出了以制冰板换回水温度为控制变量,采用模糊控制预热变频泵流量的方法,以实现制冰快速性和可靠性的解决方案.设计了预热泵流量模糊控制器,研制了制冰板换防堵塞的预热回路;采用离线计算与在线查询相结合的方法,对基于西门子可编程逻辑控制器(PLC)的冰蓄冷中央空调系统进行了试验研究,给出了制冰板换回水温度控制结果,并对该模糊控制结果与传统的PID控制结果进行了比较.试验结果表明:在环境温度为28℃时,采用模糊控制调节制冰板换回水温度,其下降时间为90 m in,调节时间为158 min,稳态误差为0.26℃.该方案为智能化冰蓄冷中央空调稳定运行提供了依据.
外文摘要:The plate heat exchanger of ice-storage centralized air-conditioning system is always jammed.With the objective of making ice quickly and reliably,a solve scheme was proposed.With consideration of the return water temperature of ice-making plate heat exchanger as controlled variable,the scheme regulated the flow rate of pre-heat pump by means of fuzzy control.A fuzzy controller was designed to dominate the flow rate of the pump,and a pre-heat loop was developed to prevent the ice-making plate heat exchanger from jamming.The experimental investigation of Siemens PLC based ice-storage centralized air-conditioning was performed by combining offline calculation with online inquiry,and the control effect of return water temperature of ice-making plate heat exchanger was compared with the traditional PID control.The results show that when the environmental temperature is 28 ℃,the fall time,the settling time and the steady state error of return water temperature are 90 min,158 min and 0.26 ℃,respectively.The scheme provides the basis for stable operation of the intelligent ice-storage centralized air conditioning system.
参考文献:
正在载入数据...